As part of its responsible environmental policy, ENGIE is looking to develop one of its brownfield sites, located in the commune of Précy-sur-Oise (France). If you are looking for a plot of land as part of an innovative and environmentally friendly project, apply before November 25, 2022.

What's our objective ?

This call aims to identify partners wishing to develop an innovative and/or ecologically virtuous project, while developing a brownfield site (1,019 m²) belonging to ENGIE, in the town of Précy-sur-Oise (France).

To whom is our call addressed?

This call for projects is open to all project leaders from : 

  • Local authorities,
  • Companies, 
  • Public institutions of higher education and research, 
  • Research laboratories,
  • Associations ...

The development projects submitted must be compatible with the characteristics of the land (described below) and may be:

  • alternative uses with biodiversity conservation/enhancement (renaturation) 
  • ecological compensation, 
  • development of new techniques for soil decontamination, nature protection,...
  • installations benefiting the community (educational courses, leisure activities or outdoor sports, ...),
  • or any other project (life-size research tests, third-party site, above-ground urban agriculture, social and solidarity-based economic activity, etc.) compatible with this space.

The selected project must have the approval of the local authority (municipality, if necessary the agglomeration community). 

Why answer our call ?

  • To have a bare plot of land at your disposal under advantageous conditions,
  • To gain visibility alongside ENGIE on two key themes:

- an ecologically responsible approach in order to give back an activity/utility to an industrial wasteland located in a favourable environment,

- the promotion of an innovative and virtuous project.

We tell you more...

ENGIE's real estate assets are mainly marked by the industrial history of Gaz de France. Approximately 80% of the real estate assets owned by ENGIE were once used for gas activities.

These activities having ceased in the early 1970s, ENGIE has since gradually undertaken a process of reconverting these real estate assets as part of its responsible environmental policy. 

It is within this framework that the CSP I&L of ENGIE GBS (Real Estate and Logistics Shared Services Center of ENGIE Global Business Support which is the Business Unit in charge of the support functions of ENGIE) launches a call for the reconversion of a wasteland in the town of Précy-sur-Oise (France).


The 1019 m² plot of land (cadastral section AE number 239) is located in Précy-sur-Oise - Quai de l'Oise - Chemin du Halage.

The site is located on the banks of the Oise between the Chemin de Halage (or Quai de l'Oise) to the south and the railroad to the north.

The immediate environment is little built-up, and essentially composed of natural spaces along the banks of the Oise.


The main information on the urban situation of the site is the following: 

  • Urbanism : The site is classified in zone NL of the PLU, a sub-section of the N zone (natural) authorizing installations and constructions necessary for leisure activities.
  • PPRI (Plan de Prévention des Risques Naturels) : the site is classified in a red zone - The main provisions applying in the red zone are the following:

      - Prohibitions: all constructions or land uses subject to building permit or prior declaration.

      - Authorizations subject to conditions

               o equipment of general interest for open-air sports and their accompanying constructions (maximum space of 0.1%, maximum overall surface area of 50 m², waterproofing of the floor by construction on a berm or piling)

              o recreational installations linked to the presence of water (water sports, fishing, hunting, etc.) with a maximum right of way of 0.1%, maximum overall surface area of 20 m² and the floor must be protected from the water by construction on an embankment or pilings

  • Easements : none

 You can download the presentation document of the site which is attached at the bottom of this page.

Contractual Framework and Regulatory Limits

  • Occupation of the site will be possible from March 2023.
  • The restrictions and precautions for the use of the soil and subsoil applicable to the site are as follows

- the prohibition of vegetable gardens and orchards in the open ground or using the land of the site,

- a ban on the use of underground water,

- the possible implementation of a surface soil cover to be defined according to the activity envisaged,

- the prohibition of soil excavation.

Visit of the site

A visit of the site can be organized at the request of the candidates before the submission of the proposal.

Documents to be provided

Technical documents:

  • Detailed presentation note of the project and objectives : 

- Detailed description of the activity and the different uses planned

- Implementation on the site

- Environmental ambition

- Material means to be implemented

- List of the actors of the project

- Legal and financial structure of the project

- Planning for the realization of the project

  • Terms of occupation of the land desired by the project leader: nature and duration of the lease, sustainable fees with regard to the investments).
  • Investment plan with the amounts: of the works envisaged, the expected subsidies, the financing/financiers already obtained,
  • Macro business plan if economic activity (investments, possible revenues and forecast date of reaching financial balance),


Administrative documents:

  • SIREN status notice (SIRET, APE, ...)
  • If necessary, Kbis
  • Statutes

Depending on the status of the candidate, other documents may be requested.

Eligibility and selection criteria

  • Relevance of the project to the call and to the specificities of the site
  • Environmental ambition of the project
  • Innovative character of the project
  • Anchoring of the project in the local ecosystem and the support of local stakeholders (local authorities, associations, residents, etc.)
  • Coherence of the proposed business model
  • Feasibility/economic viability
  • Maturity of the project and ease of implementation
  • Ethical aspects
  • References of the project leader

The projects will be studied taking into account these main criteria, it being specified that additional criteria may be added. 

Selection committee and partner(s) of the call for projects

  • Responsible for GBS Immo & Legal 
  • STEEN Lot 5 Project Team 
  • Designated members of the BS I&L - ENGIE GBS and BS Legal in charge of this project :

   - Experts in real estate valuation 

   - Environmental consultant  

   - Legal expert

  • The person in charge of the ENGIE Innovation Calls for Projects

Attached files

PRECY-SUR-OISE-VALO-[...].pdf

1.31 MB

Download

Sign up for the ENGIE Innovation Newsletter

Loading...

By continuing to browse, you accept that ENGIE uses cookies for the purpose of saving information about your browsing on the Site. Cookies help make your browsing experience easier and also make it possible to gather statistics about who visits the Site with the goal of improving its quality. For more information, click here.
Consult cookies policy

close icon